American Standard 2506921.002 Guía de instalación Pagina 2

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 4
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 1
2
Press TEE (1) onto SPOUT SHANK (2) making certain that
the O-RING (3) is properly seated on SHANK (2).
Push COUPLING (4) into TEE (1) and thread onto SPOUT
SHANK (2). Tighten using a 10mm (3/8'') hex wrench.
For fitting less hand spray use COUPLING (4a).
Connect the ends of the two SUPPLY HOSES (5) to the VALVES
and TEE (1). Tighten with wrench.
Remove PLUG BUTTON (6) from rear of SPOUT (7). Loosen
SPOUT SCREW (8) with 4mm hex wrench supplied.
Install SPOUT (7) onto SPOUT SHANK (9). Align SPOUT (7).
Pushing down on SPOUT (7) tighten SET SCREW (8). Insert
PLUG BUTTON (6).
Install DIVERTER KNOB (9) onto LIFT ROD (10) in rear of
SPOUT (7). VIEW “B” Fig. 1.
Thread DIVERTER KNOB (9) clock-wise to secure it to the
LIFT ROD (10). VIEW “B” Fig. 2.
TEE AND HOSE ASSEMBLY
3
INSTALL TUB SPOUT
MAKE WATER SUPPLY CONNECTIONS
Connect HOT water supply to LEFT INLET UNION (11) and COLD water supply to
RIGHT INLET UNION (12). Pipe connections are 3/4" NPT. Union connections are not supplied and must be purchased separately.
Use sealant or Teflon tape on pipe connections.Use sealant or Teflon tape on pipe connections.
IMPORTAMT: Do not solder directly to valve body.
HOT
COLD
3/4" NPT
M968694 Rev.1.5
5
INSTALL HANDLES
TIGHTEN
FIG. 1 FIG. 2
4mm Hex
wench
(supplied)
10mm (3/8)
Hex wench
2
3
11
12
1
4
VIEW "B"
VIEW "B"
5
5
9
9
10
6
9
8
7
4a
10
4
Turn VALVE STEMS (1) to the OFF position as shown in illustration.
Insert O-RINGS (4) into ESCUTCHEONS (3).
Align HANDLES (2) as shown. Lubricate O-RING (5) with water.
Push HANDLE (2) onto VALVE STEM (1). The HANDLE (2) is
installed properly when the top of the handle base is flush with
top of ESCUTCHEON (3).
2
3
1
4
OFF
OFF
1
NOTE: Once the HANDLES (2) are installed they are difficult to
remove from the VALVE STEM (1) to make any adjustments.
Make sure HANDLES (2) are properly aligned before they are
installed onto the VALVE STEMS (1). Only push HANDLES (2)
completely down into place when alignment is satisfactory.
5
Vista de pagina 1
1 2 3 4

Comentarios a estos manuales

Sin comentarios